



























Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Energy Plant Maintenance Comprehensive Study Guide with Key Concepts and 260 Practice Questions and Answers 2025
Typology: Exams
1 / 35
This page cannot be seen from the preview
Don't miss anything!
Adjustable wrenches should only be used : A ) With the turning force applied to the fixed jaw B ) On piping C ) With a universal joint D ) With the turning force applied to the moving jaw E ) To tap threads - ✅ A A screwdriver having a square tip is known as : A ) A slot B ) A Jacobson C ) A Robertson D ) A Phillips E ) An Allen - ✅ C Whatever the size of a micrometer , the working parts can only move a distance of : A ) 30 mm B ) 200 mm C ) 25 mm D ) 300 mm E ) 250 mm - ✅ C To measure valve tappet clearances , one would most aptly use : A ) A depth micrometer B ) Round or fillet gauges C ) A thread micrometer D ) An inside micrometer E ) Feeler gauges - ✅ E Taper , plug and bottoming are types of : A ) Dies B ) Punches C ) Files D ) Taps E ) Wrenches - ✅ D Hand taps are usually made in sets of three called : A ) Primary , secondary , and finishing B ) SAE , ISO , Metric C ) Taper , plug , and bottoming D ) Warding , mill , and bastard E ) Rough , coarse , and fine - ✅ C An important safety check when using any grinder is to ensure : A ) The grinder is designed for right handed people B ) The guard is removed C ) Wheel speed is correct D ) The power is turned on E ) The grinder is light weight - ✅ C
Chalk or may be used to rub on the surface of rough castings as a marking material. A ) Aluminum sulphate B ) Wax C ) Blue vitriol D ) Grinding compound E ) Soap stone - ✅ E In general hacksaw blades used on thin metal : A ) Have coarser teeth B ) Are thinner Are made of flexible steel D ) Are painted orange E ) Have more teeth - ✅ E Micrometers are available in a variety of types and are used mainly for the measurement of : A ) The density of the boiler flue gases for pollution control B ) Outside , inside , and depth dimensions of relatively small openings of objects Vertical , perpendicular and parallel distances in assembly of power plant machines D ) Length , width , and thickness of the boiler house structure E) Dissolved solids in boiler water - ✅ B A tap with the marking M4 would indicate a : A ) Tap with metallic threads B ) Metric thread , 4 cm nominal diameter of the thread C ) Metric thread , 4 mm nominal diameter of the thread D ) Metric thread E ) Metric thread , 4 threads per mm - ✅ C To shear old bolts or split nuts , you would select : A ) A diamond point chisel B ) A hacksaw C ) A ball peen hammer D ) A rasp E ) A flat chisel - ✅ E When drilling speed is too fast , it results in : A ) The hole will be too deep B ) The drill bit will get struck and break C ) The metal will melt D ) The drill bit will fail due to centrifugal forces E ) It will dull the - ✅ E When using a file properly : A ) No force is required B ) Apply force on the back stroke C ) Avoid using a handle D ) Apply force on the forward stroke only E ) Apply force in both directions - ✅ D
Steam boilers on standby that are layed up with water in them , should have their pH adjusted to : A ) 5.5 B ) 12 C ) 7 D ) 8 E ) 10 - ✅ E When boilers are layed up for long periods in freezing conditions , the chosen method is usually : A ) Heated layup while maintaining a pilot B ) Dry layup C ) Wet layup D ) Wet layup with antifreeze E ) Dry layup with a small flame to maintain temperature above freezing - ✅ B When a boiler is locked out by a competent operator : A ) Maintenance activities can proceed immediately B ) It must be approved by an inspector C ) The plant manager must double check the procedure D ) A second competent operator must verify correctness E ) The safety department must verify the correct type of locks are used - ✅ D A boiler on wet layup should maintain a nitrogen blanket of : A ) 40 kPa B ) 100 kPa C ) 10 Kpa D ) 0 kPa E ) 200 kPa - ✅ A During the summer layup period , hot water boilers are usually : A ) Kept full of chemically treated water B ) Refilled with fresh municipal water C ) Maintained full of caustic soda D ) Drained and dried out E ) Dismantled and dried - ✅ A Blowdown on steam boilers is increased before shutting down to : A ) Discharge sediment and sludge B ) Make room for fresh water and chemicals C ) Lower the boiler level D ) Test the level controls E ) Verify the low level shutdown - ✅ A Wet layup of steam boiler that are being kept out of service for a period of time , but must remain ready to be put back online with short notice should : A ) Maintain the boiler completely full of water to prevent oxygen from entering the boiler B ) Kept running at all times C ) Dismantled and new parts ordered D ) Should be layed up dry E ) Be drained completely and dried out - ✅ A
When preparing to remove a hot water boiler from service , all of these are done prior to closing the fuel gas valve except : A ) Blowdown the boiler to remove sediment B ) Perform a try lever test on the safety relief valve C ) Lock out the boiler draft fan D ) Test operating and limit controls E ) Test the water chemistry - ✅ C When a competent operator shuts down and locks out a boiler , they will : A ) Lock out the water and steam systems only B ) Only lockout the steam system C ) Follow manufacturers recommendation only D ) Use double locks on all gas lines E ) Follow site specific procedures - ✅ E Boilers that are on shutdown on standby are usually layed up using the. ‒‒‒‒‒ method. A ) Hot standby B ) Dry layup C ) Drained and hot D ) Maintained at full pressure E ) Wet layup - ✅ E When preparing to remove a hot water boiler from service , all of these are done prior to closing the fuel gas valve except : A ) Blowdown the boiler to remove sediment B ) Perform a try lever test on the safety relief valve C ) Lock out the boiler draft fan D ) Test operating and limit controls E ) Test the water chemistry - ✅ C Wet layup of steam boiler that are being kept out of service for a period of time , but must remain ready to be put back online with short notice should : ✓OA ) Maintain the boiler completely full of water to prevent oxygen from entering the boiler B ) Kept running at all times C ) Dismantled and new parts ordered D ) Should be layed up dry E ) Be drained completely and dried out. - ✅ A A boiler on wet layup should maintain a nitrogen blanket of : A ) 40 kPa B ) 100 kPa C ) 10 Kpa D ) 0 kPa E ) 200 kPa - ✅ A When boilers are layed up for long periods in freezing conditions , the chosen method is usually : A ) Heated layup while maintaining a pilot B ) Dry layup C ) Wet layup D ) Wet layup with antifreeze E ) Dry layup with a small flame to maintain temperature above freezing - ✅ B
A device found on the pressure side of a steam boiler operating control switch is a : A ) Test connection for an inspector B ) Feedwater pressure gauge C ) Siphon D ) Combustion air proving switch E ) Modutrol motor - ✅ C A hot water boiler operating control can be a pressure switch : A ) Which is sensitive to the expansion and contraction of boiler water B ) Sensitive to boiler steam pressure C ) Which is normally open D ) Utilizing a closed liquid filled system E ) Sensitive to steam pressure - ✅ D On hot water heating boilers , a high limit temperature control switch : A ) Is necessary on all boilers B ) Usually does not require manual resetting C ) Activates after the safety valve opens D ) Must be installed on automatically fired boilers E ) Is a normally open switch - ✅ D Hot Water heating boilers with fully modulating burners require : A ) Modulating Level control B ) Back up on - off control C ) Modulating pressure control D ) Modulating flow control E ) Modulating temperature control - ✅ E Modulating burner controls operate by regulating : A ) Fuel flow and atomizing steam flow B ) Fuel temperature and air flow C) Steam flow and fuel flow D ) Fuel flow , air flow , and feedwater pressure E ) Fuel flow and air flow - ✅ E The controlled variable in heating boilers with modulating control cause a bellows to operate a : A ) Hydrostat B ) Shut down valve C ) Alarm D ) Mercury switch E ) Potentiometer - ✅ E A thermal element is : A ) Used to measure heat content B ) A type of open system C ) Commonly termed an " Aquastat " D ) Capable of sensing temperature and converting it to a pressure signal E ) Used to measure pressure - ✅ D
The operating cut off for low pressure steam heating boilers should be set at : A ) 70 kPa B ) 115 kPa C ) 35 kPa D ) 100 kPa E ) 45 kPa - ✅ A The type of combustion fuel control frequently used on a smaller package boiler , is a / an : A ) Scanner B ) Constant pressure control C ) On and off control D ) Modulating control E ) High fuel level cut - off - ✅ C An Aquastat : A ) Can be located away from its point of measurement B ) Is a modulating device C ) Measures water flow D ) Senses water level E ) Is used on steam boilers - ✅ A Positive displacement compressors : A ) Could be single stage with three cylinders B ) Could be of the centrifugal type C ) Must all use internal lubrication D ) Must all use cylinder valves E ) Require a positive water seal - ✅ A In a centrifugal compressor the kinetic energy is converted to potential energy in the : A ) Intercooler B ) Volute only C ) Volute , diffuser or both D ) Diffuser only E ) Compressor cavity - ✅ C The two types of dynamic compressor are centrifugal and : A ) Screw B ) Axial C ) Gear D ) Scroll E ) Lobe - ✅ B The valves on a reciprocating compressor are opened by : A ) The eccentric B ) A pressure difference C ) A timing gear D ) The camshaft ) Hydraulic pressure - ✅ B Air compressors that supply instrument air should : A ) Have turbine drivers B ) Have air intake far from sources of exhaust C ) Not be used for any other purpose D ) Be located on the roof E ) Always be positive displacement - ✅ B
In order to keep rope from untwisting under load : A ) Rope thimbles should be used B ) It requires a synthetic binder C ) Each end requires " whipping " D ) It should be moistened E ) It is made with left and right handed counteracting twists - ✅ E Stove bolt nuts are usually : A ) Left hand thread B ) Hexagonal Self locking D ) Fine thread E ) Square
Platforms should have a edge going around them to prevent objects from rolling off. A ) Raised B ) Wire C ) Square D ) Magnetic E ) Metal - ✅ A Lock washers : A ) Prevent unwanted turning of the bolt or nut B ) Distribute the lock nut force C ) Prevent anyone from dismantling the object D ) Allow oversized bolts or nuts to be used E ) Prevent marring of the work surface - ✅ A An M24 coarse thread bolt has : A ) 3 threads per mm B ) 2 mm per thread C ) 3 mm per thread D ) 3.5 threads per mm E ) 3.5 mm per thread - ✅ C A knot used to pull at right angles to a pipe or pole is the : A ) Clove hitch B ) Reef knot C) Timber hitch D ) Bowline E ) Round turn and two half hitches - ✅ A When joining two ropes of different diameters , we use a : A ) Round turn and three half hitches B ) Figure eight knot C ) Reef knot D ) Sheep shank E ) Sheet bend - ✅ E The mechanical fastener used in the assembly of automotive and plant machinery is the : A ) Machine screw B ) Stove bolt C ) Carriage bolt D ) Machine bolt E ) Cap screw - ✅ D A strand of fiber rope is : A ) The most important part of the rope B ) Composed of fibers twisted right - handed C ) The smallest component of the rope D ) At least 20 metres in length E ) Composed of yarns twisted left - handed - ✅ E A yellow scaffold tag indicates : A ) The scaffold is safe to use but there are hazards B ) The scaffold is unsafe C ) The scaffold is almost unsafe to use D ) The scaffold is only safe for 1 person at a time E ) The scaffold needs repair - ✅ A
A boiler circulating pump gland should have some leakage : A ) In order to keep the motor amperage down B ) To prevent the packing from drying out C ) So that the shaft sleeve will take the wear D ) In order for the stuffing box to run at the desired high temperature E ) So the operator can tell when the pump becomes vapour bound - ✅ B It is recommended that a new boiler be shut down , drained , opened up , flushed out and inspected after the first ________ months of operation. A ) Six B ) Twelve C ) Three D ) Two E ) Nine - ✅ C When the fireside of a boiler is first opened up , small leak seepage spots can be detected by : A ) Hissing sounds B ) Water on the furnace floor C ) White salt deposits resulting from water evaporation D ) Water running down the tubes E ) Ultraviolet light - ✅ C A tube expander is used for : A ) Repairing cracks in leaking tube B ) Expanding the tube end ) C) Making the tube longer D ) Bending tubes E ) Making the tube stronger - ✅ B Boiler furnace refractory should be to prolong its life. A ) Oiled to prevent corrosion B ) Painted with heat resistant paint C ) Wire brushed D ) Washed with a high - pressure hose E ) Wash coated with a dilute solution of heat resistant cement - ✅ E A water tank should be installed above the boiler and attached to the vent connection during a wet lay up in order to : A ) Prevent water vapour from entering the power plant B ) Hold the manway doors closed C ) Prevent air from entering the boiler during water contraction D ) Permit the injection of chemicals. E ) Prevent the wastage of chemicals - ✅ C Boilers that are maintained on hot standby should be : A ) Left with a fire in the furnace B ) Dried out on the water side C ) Nitrogen capped D ) Steam capped E ) Drained - ✅ D
The final step in replacing a firetube is : A ) Firing the boiler up to normal working pressure B ) A light re - expansion C ) Filling the boiler with water and checking for leaks D ) Annealing the tube ends E ) Applying a hydrostatic test - ✅ E A ) 1 , 2 , 4 B ) 1 , 2 , 3. C ) 2 , 3 D ) 2 , 3 , 4 E ) 1 , 2 , 3 , 4 - ✅ A The interior of firetubes are cleaned to remove deposits of : A ) Corrosion B ) Salt C ) Algae D ) Scale E ) Soot - ✅ E Laying up a boiler means : A ) Preparing the boiler for a period of storage B ) Preparing a boiler for start up C ) Raising the boiler D ) Setting the boiler on its foundation E ) Taking the boiler down for an annual overhaul - ✅ A A substance that will absorb humidity inside a boiler during dry lay up is : A ) Activated alumina B ) Sodium chloride C ) Zeolite D ) Sodium sulphite E ) Lime soda - ✅ A A tube beading tool is used : A ) To cut fire tubes B ) To unfasten fire tubes from the tube sheet C ) On firetube boilers D ) To fasten the stays in the tube sheet E ) On watertube boilers - ✅ C Who should be responsible for doing frequent boiler inspections? A ) The Boiler Inspector B ) The Owner C ) The Chief Inspector D ) The Insurance Agent E ) The Steam Plant operator - ✅ E Thinning and grooving of metal parts is A ) Carbon Monoxide B ) High Hardness C ) Carbon Dioxide D ) Oxygen E ) Scale - ✅ C
Condensate polishers can control suspended matter , hardess and : A ) Molybdates B ) Sulphites C ) Temperature D ) Dissolved Oxygen E ) Chlorides - ✅ E Just before entering the waterside of the boiler it is important to : A ) Obtain permission to do so from plant management B ) Ensure the Chief Engineer is aware of your intent C ) Notify the inspector in writing of your intent to do so D ) Be wearing self - contained breathing apparatus SCBA E ) Test the atmosphere - ✅ E One of the legal responsibilities of the engineer during an inspection is : A ) To notify the Workers ' Compensation Board of the inspection B ) To be in possession an inspection certificate C ) To allow the inspector onto the premises , but only during working hours D ) Point out any known or suspected defects to the inspector E ) To have at least two staff members present at all times - ✅ D For an alkaline boil out , the boiler is maintained at a desired steam pressure for about : A ) 16 hours B ) 48 hours C ) 24 hours D ) 8 hours E ) 12 hours - ✅ B Chemical cleaning of smaller boilers is not usually done because : A ) They do not have adequate support for the high density of the chemicals B ) Of the small surface area which the chemical contacts C ) It is impossible to get the chemical circulating adequately D ) Of the thin metal of which they are manufactured E ) The cost to do so is not warranted or justified - ✅ E Before cleaning the waterside and as far as is possible : A ) Tubes should be " turbined " B ) A scale sample should be taken and an analysis done C ) All drum internals should be removed D ) Mud drum sludge should be completely removed E ) A visual inspection of pressure parts should be completed - ✅ E A boiler inspection : A ) Is done with the owners permission only B ) Is only required after a boiler has been operating 3 years C ) Must be done whenever the boiler inspector requests it D ) Is only required if an accident occurs E ) Must be done after every shut down of the boiler - ✅ C
The recommended procedures for a boiler inspection are stated in the : A ) ASME Boiler and Pressure Vessel Code , Section I B ) Alberta Pressure Equipment Safety Regulation C ) CSA B51 Boiler Pressure Vessel and Pressure Piping Code D ) ASME Boiler and Pressure Vessel Code , Section VII E ) ASME Boiler and Pressure Vessel Code , Section IV - ✅ D A hydrostatic test on a high pressure steam boiler : A ) Will test the high pressure steam fuel cut off B ) Must only be done by the inspector C ) Must be done according to jurisdictional regulations D ) Must be done before every start up of a boiler E ) Should be done with the Chief Engineer present - ✅ C When the boiler is removed from service , it can be drained once the temperature reaches approximately : A ) 65 ° C B ) 70 ° C C ) 90 ° C D ) 150 ° C E ) 50 ° C - ✅ C A relatively safer chemical used in boiler cleaning and treatment is : A ) Sodium hydroxide B ) Chelates C) Trisodium phosphate D ) Caustic soda E ) Hydrazine - ✅ B An inhibitor , when added to acid will : A ) Make the acid compatible with the sewer system for disposal B ) Cause foaming in the boiler C ) Strengthen the acid thereby shortening the cleaning procedure D ) Prevent the acid from attacking the boiler metal E ) Minimise the effect the acid has on the metal - ✅ E A boiler has been in operation for one year and is now taken off the line for cleaning , repair and inspection. The boiler is one of three in a battery and the other two will remain in operation. This one boiler is to be drained and cooled. Before any person is allowed to enter the boiler drum , the correct safety procedure requires that the : A ) Main steam , blow down , blow off , and feedwater valves be closed , chained and tagged B ) Person is equipped with the correct kind of tools and a list of required repairs C ) Worker is provided with a safety kit for confined space entry D ) Worker is provided with a safety line , first aid kit , and hard hat E ) Drum be vented , the safety valve gagged , and all ashes and soot removed from the fire box - ✅ A
Just before entering the waterside of the boiler it is important to : A ) Obtain permission to do so from plant management B ) Ensure the Chief Engineer is aware of your intent C ) Notify the inspector in writing of your intent to do so D ) Be wearing self - contained breathing apparatus SCBA E ) Test the atmosphere - ✅ E For an alkaline boil out , the boiler is maintained at a desired steam pressure for about : A ) 16 hours. B ) 48 hours C ) 24 hours D ) 8 hours E ) 12 hours - ✅ B Chemical cleaning of smaller boilers is not usually done because : A ) They do not have adequate support for the high density of the chemicals B ) Of the small surface area which the chemical contacts C ) It is impossible to get the chemical circulating adequately D ) Of the thin metal of which they are manufactured E ) The cost to do so is not warranted or justified - ✅ E Before cleaning the waterside and as far as is possible : A ) Tubes should be " turbined " B ) A scale sample should be taken and an analysis done C ) All drum internals should be removed D ) Mud drum sludge should be completely removed E ) A visual inspection of pressure parts should be completed - ✅ E A boiler inspection : A ) Is done with the owners permission only B ) Is only required after a boiler has been operating 3 years C ) Must be done whenever the boiler inspector requests it D ) Is only required if an accident occurs E ) Must be done after every shut down of the boiler - ✅ C The recommended procedures for a boiler inspection are stated in the : A ) ASME Boiler and Pressure Vessel Code , Section I B ) Alberta Pressure Equipment Safety Regulation C ) CSA B51 Boiler Pressure Vessel and Pressure Piping Code D ) ASME Boiler and Pressure Vessel Code , Section VII E ) ASME Boiler and Pressure Vessel Code , Section IV - ✅ D A hydrostatic test on a high pressure steam boiler : A ) Will test the high pressure steam fuel cut off B ) Must only be done by the inspector C ) Must be done according to jurisdictional regulations D ) Must be done before every start up of a boiler ) Should be done with the Chief Engineer present -
Question When the boiler is removed from service , it can be drained once the temperature reaches approximately : A ) 65 ° C B ) 70 ° C C ) 90 ° C D ) 150 ° C E ) 50 ° C - ✅ C relatively safer chemical used in boiler cleaning and treatment is : A ) Sodium hydroxide B ) Chelates C ) Trisodium phosphate D ) Caustic soda E ) Hydrazine - ✅ B An inhibitor , when added to acid will A ) Make the acid compatible with the sewer system for disposal B ) Cause foaming in the boiler C ) Strengthen the acid thereby shortening the cleaning procedure D ) Prevent the acid from attacking E ) Minimise the effect the acid has on the metal - ✅ E A boiler has been in operation for one year and is now taken off the line for cleaning , repair and inspection. The boiler is one of three in a battery and the other two will remain in operation. This one boiler is to be drained and cooled. Before any person is allowed enter the boiler drum , the correct safety procedure requires that the : A ) Main steam , blow down , blow off , and feedwater valves be closed , chained and tagged OB Person is equipped with the correct kind of tools and a list of required repairs ) Worker is provided with a safety kit for confined space entry D ) Worker is provided with a safety line , first aid kit , and hard hat E ) Drum be vented , the safety valve gagged , and all ashes and soot removed from the fire box - ✅ A The most popular acid for boiler cleaning is : A ) Sulphuric B ) Chelate C ) Hydrochloric D ) Phosphoric E ) Nitric - ✅ C When cooling down a steam boiler that has been taken out of service , a vent valve on the steam drum should be opened to prevent a vacuum at : A ) 0 Kpa B ) 100 kPa C ) 90 degrees D ) 50 % load E ) 175 kPar - ✅ E