Digital wellbeing research project, Assignments of Management Information Systems

Managing successful Computing research project

Typology: Assignments

2020/2021

Uploaded on 02/23/2021

isfaq-rock
isfaq-rock 🇱🇰

4.4

(10)

3 documents

1 / 62

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
ITHREES MOHAMED ISHRAK 1 | P a g e
Higher Nationals
Internal verification of assessment decisions BTEC (RQF)
INTERNAL VERIFICATION ASSESSMENT DECISIONS
Programme title
BTEC Higher National Diploma in Computing
Assessor
Internal Verifier
Unit(s)
Unit 6 Managing a Successful Computing Project
Assignment title
Digital wellbeing - Management Information System Project
Student’sname
List which assessment
criteria the Assessor
has
awarded.
Pas
s
Merit
Distinction
INTERNAL VERIFIER CHECKLIST
Do the assessment criteria awarded
match
those shown in the
assignment brief?
Y/N
Is the Pass/Merit/Distinction grade
awarded
justified by the assessor’s
comments on the
student work?
Y/N
Has the work been assessed
accurately?
Y/N
Is the feedback to the student:
Give details:
Constructive?
Linked to relevant
assessment
criteria?
Identifying opportunities
for improved
performance?
Agreeing actions?
Y/
N
Y/
N
Y/
N
Y/
N
Does the assessment decision need
amending?
Y/N
Assessor signature
Date
Internal Verifier signature
Date
Programme Leader signature(if
required)
Date
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e
pf2f
pf30
pf31
pf32
pf33
pf34
pf35
pf36
pf37
pf38
pf39
pf3a
pf3b
pf3c
pf3d
pf3e

Partial preview of the text

Download Digital wellbeing research project and more Assignments Management Information Systems in PDF only on Docsity!

Higher Nationals

Internal verification of assessment decisions – BTEC (RQF)

INTERNAL VERIFICATION – ASSESSMENT DECISIONS

Programme title BTEC Higher National Diploma in Computing

Assessor Internal Verifier

Unit(s) Unit 6 Managing a Successful Computing Project

Assignment title Digital wellbeing^ -^ Management Information System Project

Student’sname List which assessment criteria the Assessor has awarded.

Pas s

Merit Distinction

INTERNAL VERIFIER CHECKLIST

Do the assessment criteria awarded match those shown in the assignment brief?

Y/N

Is the Pass/Merit/Distinction grade awarded justified by the assessor’s comments on the student work?

Y/N

Has the work been assessed accurately?

Y/N

Is the feedback to the student: Give details:

  • Constructive?
  • Linked to relevant assessment criteria?
  • Identifying opportunities for improved performance?
  • Agreeing actions?

Y/

N Y/

N

Y/

N

Y/

N Does the assessment decision need amending?

Y/N

Assessor signature Date

Internal Verifier signature Date Programme Leader signature (if required)

Date

Confirm actioncompleted

Remedial actiontaken

Give details:

Assessor signature Date

Internal Verifier signature

Date

Programme Leader signature (ifrequire d)

Date

Pearson

Higher Nationals in

Computing

Unit 6: Managing a Successful

Computing Project

General Guidelines

  1. A Cover page or title page – You should always attach a title page to your assignment. Use previous page as your cover sheet and be sure to fill the details correctly.
  2. This entire brief should be attached in first before you start answering.
  3. All the assignments should prepare using word processing software.
  4. All the assignments should print in A4 sized paper, and make sure to only use one side printing.
  5. Allow 1” margin on each side of the paper. But on the left side you will need to leave room for binging.

Word Processing Rules

  1. Use a font type that will make easy for your examiner to read. The font size should be 12 point, and should be in the style of Time New Roman.
  2. Use 1.5 line word-processing. Left justify all paragraphs.
  3. Ensure that all headings are consistent in terms of size and font style.
  4. Use footer function on the word processor to insert Your Name, Subject, Assignment No, and Page Number on each pag e. This is useful if individual sheets become detached for any reason.
  5. Use word processing application spell check and grammar check function to help edit your assignment.

Important Points:

  1. Check carefully the hand in date and the instructions given with the assignment. Late submissions will not be accepted.
  2. Ensure that you give yourself enough time to complete the assignment by the due date.
  3. Don’t leave things such as printing to the last minute – excuses of this nature will not be accepted for failure to hand in the work on time.
  4. You must take responsibility for managing your own time effectively.
  5. If you are unable to hand in your assignment on time and have valid reasons such as illness, you may apply (in writing) for an extension.
  6. Failure to achieve at least a PASS grade will result in a REFERRAL grade being given.
  7. Non-submission of work without valid reasons will lead to an automatic REFERRAL. You will then be asked to complete an alternative assignment.
  8. Take great care that if you use other people’s work or ideas in your assignment, you properly reference them, using the HARVARD referencing system, in you text and any bibliography, otherwise you may be guilty of plagiarism.
  9. If you are caught plagiarising you could have your grade reduced to A REFERRAL or at worst you could be excluded from the course.

Assignment Brief

Unit Learning Outcomes:

LO1 Establish project aims, objectives and timeframes based on the chosen theme.

LO2 Conduct small-scale research, information gathering and data collection to generate

knowledge to support the project.

LO3 Present the project and communicate appropriate recommendations based on

meaningful conclusions drawn from the evidence findings and/or analysis.

LO4 Reflect on the value gained from conducting the project and its usefulness to support

sustainable organizational performance.

Student Name /ID Number

Unit Number and Title Unit 6: Managing a Successful Computing Project

Academic Year 2019/

Unit Tutor

Assignment Title Digital wellbeing - Management Information System Project

Issue Date

Submission Date

IV Name & Date

Submission Format:

The submission is in the form of an individual written report. This should be written in a concise,

formal business style using single spacing and font size 12. You are required to make use of

headings, paragraphs and subsections as appropriate, and all work must be supported with

research and referenced using the Harvard referencing system. Please also provide an end list

of references using the Harvard referencing system.

Assignment Brief and Guidance:

Digital Wellbeing in a Management Information

System (MIS) Project Scenario

You work as a trainee Digital Well-being Specialist for a leading business organization. As a part of your role, you have to carry out a small-scale research in order to recognize a range of digital products and features which ensure a great end user experience for all at the organization. Whilst technology and the internet can simplify and enhance our lives they can also be distracting, be a cause of anxiety, and make us feel upset. Being in control of technology enables us to use its full potential and gain all the benefits of it.

Digital Wellbeing is about fashioning and sustaining a healthy relationship with technology. As technology plays a big part in human lives at workplace so people find themselves spending an increasing amount of time online and on their devices. Human wellbeing is dependent upon mental and physical health and thereby digital wellbeing is influenced by online interactions and the amount of time spend on digital devices accessing information through management information system to perform business operations. Nowadays there is an increasing demand from users for healthier and calmer experiences when engaging with digital content. For example Google mail services allow users to snooze emails for later viewing.

You are expected to explore the research area

Making digital technologies accessible: how can digital products and features ensure a great end user experience for all?

from the standpoint of a prospective computing professional.

This assignment focuses to provide the opportunity for you to investigate digital wellbeing within computing systems and explore the

Grading Rubric

Grading Criteria Achieved Feedback

LO1 Establish project aims, objectives and timeframes

based on the chosen theme

P1 Devise project aims and objectives for a chosen scenario.

P2 Produce a project management plan that covers aspects of cost, scope, time, quality, communication, risk and resources.

P3 Produce a work breakdown structure and a Gantt Chart to provide timeframes and stages for completion.

M1 Produce a comprehensive project management plan, milestone schedule and project schedule for monitoring and completing the aims and objectives of the project.

LO2 Conduct small-scale research, information gathering and data collection to generate knowledge to support the project

P4 Carry out small-scale research by applying qualitative and quantitative research methods appropriate for meeting project aims and objectives.

M2 Evaluate the accuracy and reliability of different research methods applied.

D1 Critically evaluate the project management process

and appropriate research methodologies applied.

LO3 Present the project and communicate appropriate recommendations based on meaningful conclusions drawn from the evidence findings and/or analysis

P5 Analyse research and data

using appropriate tools and

techniques.

P6 Communicate appropriate recommendations as a

result of research and data analysis to draw valid and

meaningful conclusions.

M3 Evaluate the selection of appropriate tools and

techniques for accuracy and authenticity to support and

justify recommendations.

LO4 Reflect on the value gained from conducting the project and its usefulness to support sustainable organisational performance

P7 Reflect on the value of undertaking the research to meet stated objectives and own learning and performance.

M4 Evaluate the value of the project management

process and use of quality research to meet stated

objectives and support own

learning and performance.

D2 Critically evaluate and reflect on the project

outcomes, the decision making process and changes

or developments of the initial project management plan

to support justification of

recommendations and learning during the project.

Table of Contents

1.1 Describe aims and objectives for project which you’re introducing. Your explanation

1.2 Produce a comprehensive project management plan, the plan should include milestone schedule and project schedule for monitoring and completing the aims and objectives of the

2.2 Evaluate the project’s management process and appropriate research methodologies Provide a reflection on the value of undertaking the research to meet stated objectives with your own learning and performance which includes a discussion of the project outcomes, its usefulness to support sustainability of the given organization and its’ performance, the decision- making

  • Acknowledgement ........................................................................................................................
  • Introduction .................................................................................................................................
  • TASK – 01 ...................................................................................................................................
    • assessment project. .................................................................................................................. should include a brief introduction about the company, and other relevant information to the
      • Project aims and objectives ................................................................................................... - Following are the aims and objectives of digital wellbeing project .......................................
      • Management Information System .........................................................................................
      • About The Company ............................................................................................................ - Digital Improvements in Nawaloka Hospital ......................................................................
    • management. ........................................................................................................................... project that includes cost, scope, time, quality, communication, and risk and resources
      • Introduction to the Risk Management Plan Template ............................................................
      • Project aims and objectives ................................................................................................... - Scope ............................................................................................................................... - Milestone ..........................................................................................................................
      • Schedule management Plan .................................................................................................. - Work Breakdown Structure ..............................................................................................
        • Project Log Sheet .............................................................................................................. - ........................................................................................................................................
          • Risk Management Processes ..............................................................................................
          • Cost Management .............................................................................................................
          • Communications Management ..........................................................................................
          • Resource Management ......................................................................................................
    • for completion. ........................................................................................................................ 1.4 Produce a work breakdown structure and a Gantt chart to provide timeframes and stages
      • Work breakdown structure ..................................................................................................
      • Gantt chart ..........................................................................................................................
  • TASK – 02 ...................................................................................................................................
    • aims and objectives .................................................................................................................. 2.1 Explain qualitative and quantitative research methods appropriate for meeting project
      • Research methods ................................................................................................................
      • Qualitative Research ............................................................................................................ - Qualitative Research Methods ...........................................................................................
        • Interviews
      • Quantitative Research ..........................................................................................................
        • Quantitative Research Methods ........................................................................................
        • Questionnaires ..................................................................................................................
    • research .................................................................................................................................. applied, the accuracy and reliability of different research methods applied for the small scale
      • Project management process .................................................................................................
      • Accuracy and reliability methods ..........................................................................................
        • Accuracy and reliability in Qualitative Research ................................................................
        • Accuracy and reliability in Interviews ...............................................................................
        • Accuracy and reliability in Quantitative Research .............................................................
        • Accuracy and reliability in questionnaires .........................................................................
  • TASK – 03 ...................................................................................................................................
    • 3.1 Analyze research data using appropriate tools and techniques. .......................................
      • Data analysis ........................................................................................................................
      • Qualitative data analysis .......................................................................................................
        • Qualitative data analysis tools and techniques ....................................................................
      • Quantitative data analysis ....................................................................................................
        • Quantitative data analysis tools and techniques .................................................................
    • valid and meaningful conclusions. ............................................................................................ 3.2 Describe appropriate recommendations as a result of research and data analysis to draw
      • Analysis of qualitative data ...................................................................................................
      • Interview analysis .................................................................................................................
      • Analysis of Quantitative Data ...............................................................................................
      • Biographical data .................................................................................................................
    • support and justify recommendations. ...................................................................................... 3.3 Evaluate the selection of appropriate tools and techniques for accuracy and authenticity to
      • Interview .............................................................................................................................
      • Schedule ..............................................................................................................................
      • Bar Chart ............................................................................................................................
      • Pie Chart .............................................................................................................................
  • TASK – 04 ...................................................................................................................................
    • justification of recommendations and learning during the project. ............................................. process and changes or developments of the initial project management plan to support
      • Key to successful learning aligning assessment with learning outcomes ..................................

TASK – 01

1.1Describe aims and objectives for project which you’re introducing. Your explanation should include a brief introduction about the company, and other relevant information to the assessment project.

Project aims and objectives

As technology plays a big part in human lives at workplace so people find themselves

spending an increasing amount of time online and on their devices. And the internet can

simplify and enhance our lives they can also be distracting, be a cause of anxiety, and make

us feel upset. Being in control of technology enables us to use its full potential and gain all

the benefits of it. Human wellbeing is dependent upon mental and physical health and

thereby digital wellbeing is influenced by online interactions and the amount of time spend

on digital devices accessing information through management information system to

perform business operations

Following are the aims and objectives of digital wellbeing project

1. spending an increasing amount of time online and on their devices

2. There is an increasing demand from users for healthier and calmer experiences when

engaging with digital content.

3. The Google for equipping users with tools to help them find a better balance between

digital and reality.

Example:-

 Google mail services allow users to snooze emails for later viewing.

Management Information System

An organized approach to the study of the information needs of an organization’s management at

every level in making operational, tactical, and strategic decisions. In a management information

system, modern, computerized systems continuously gather relevant data, both from inside and

outside an organization. This data is then processed, integrated, and stored in a centralized database

where it is constantly updated and made available to all who have the authority to access it, in a

form that suits their purpose. ( MyAccountingCourse,2018)

About The Company

The entry of Nawaloka Hospitals into the state dominated healthcare sector in 1985, saw the private

health care system take root in Sri Lanka. The launch of the hospital and the overwhelming response

it received from the people demonstrated a long felt need for superior healthcare in a pleasant

environment.

As Sri Lanka’s first premier multi-specialty hospital, Nawaloka was set up to mirror reputed

hospitals in the region which offered advanced medical technology and expert medical care, thus

eliminating the need for people to travel of Sri Lanka for specialized medical treatment. Here is the

E-channeling, Online & Pay bill. This Company located at Nawaloka Hospitals (PLC), Colombo

02, Sri Lanka

Digital Improvements in Nawaloka Hospital

  • During the year under review, we revamped our corporate website, to provide more updated information

to our customers and to provide more accessibility at all times.

  • System generated SMS will be sent to the customers to collect their reports from Laboratory and Radiology

Unit

  • Customer Feedback can be given through a finger touch KIOSK system which has been placed at the each

Cashier Point

  • Lab Reports can be collected from a KIOSK machine rather waiting in the queue and can be sent through

an email to the customer upon request

  • Patients can save time by sending their drugs prescriptions to the Pharmacy, directly through WhatsApp
  • The PACS (Picture Archiving and Communication System) is fully operational and has greatly improved

diagnostic capabilities: short and long-term storage, retrieval, management, distribution and presentation of

all radiological images and information management

  • PACS enables consultants to view the history of CT and MRI reports of the patients from their mobile

devices

  • Customers will be informed by a SMS regarding the arrival time of the doctors and changes in sessions

when channeling consultants

1.2 Produce a comprehensive project management plan, the plan should include milestone schedule and project schedule for monitoring and completing the aims and objectives of the project that includes cost, scope, time, quality, communication, and risk and resources management.

Introduction to the Risk Management Plan Template

Risk management can be defined as the processes and structures that are directed towards realizing

potential opportunities, while simultaneously managing possible adverse impacts. From a project

management perspective, risk management is a continuous activity conducted throughout the life

of the project. It seeks to identify potential risks, evaluate their likely impact, develop mitigation

plans, and monitor progress. The Risk Management Plan is typically created early in the project’s

Planning Process Phase. Risk management planning is the process of defining how to conduct

risk management activities for a project. The plan includes how the organization will identify

and address events or occurrences that could negatively or positively affect the success of a

project. The plan outlines a methodology to identify, analyze, track, and mitigate risks during the

project lifecycle. Identifying and managing risk increases the chance of successful project

completion by reducing uncertainty associated with the project. This template provides the

suggested structure for the Risk Management Plan along with instructions and descriptions

to guide the reader in understanding how to complete it.

Project aims and objectives

The objective of security planning is to improve the protection system resources. The protection of

a system must be documented in an information Technology (IT) Security Plan.

Scope

Risk Management Plan consists of the process and timing for identifying Digital Wellbeing,

mitigation actions required, and organizational responsibility for monitoring and managing the

Digital Wellbeing throughout the whole lifecycle.

Milestone

1. Finding a company

2. Planning and preparation for the meeting

3. Schedule the meeting and arrange a local visit

4. Review the process, documents and related drawings and diagrams

5. Create a full complete check list

6. A billing report has been designed for analysis of the field data by visiting

the site

7. Grant full approval from the responsible party for preparing the final report

Schedule management Plan

Work Breakdown Structure